Fort Bend Parkway Expansion
Project Description:
Paradigm Consultants, Inc. was retained by Harris County Toll Road Authority to provide construction materials engineering and testing services for the Fort Bend Parkway Expansion, Phase I, Section II. Paradigm provided materials testing for more than 4,800 linear feet of concrete toll road. Services included all phases from cut/fill to stabilization of base and asphalt, all paved with concrete. A four-span bridge was also constructed over a drainage channel. Paradigm’s testing services included embankment and utility trench fill, lime treated subgrade, cement and asphalt treated base, concrete pavement, and prestressed beams (in accordance with TxDOT guidelines).
Client:
Harris County Toll Road Authority
Ms. Lisa Castaneda